Project Overview

The Zimbabwe Kraton Ball Milling Processing Line is designed for gold ore processing in the Matabeleland gold belt. WSHT Mining Group delivered a robust crushing, grinding, gravity concentration, and CIL circuit optimized for remote African mining operations with limited infrastructure.

Ore Characteristics

The ore is a quartz vein-hosted gold deposit with coarse free gold (60% liberated at 150 microns) and fine disseminated gold in pyrite (40%). Average grade: 5.2 g/t Au. Ore competency is moderate (Bond Work Index 12.8 kWh/t). The high free gold content makes gravity concentration highly effective as a pre-concentration step.

Process Flow

Crushing: ROM ore (−400 mm) passes through a PE-750×1060 jaw crusher (primary, 130-250 t/h) and a HPT-300 cone crusher (secondary) to produce P80 = 12 mm product. A 2YK-1860 vibrating screen provides classification with oversize recirculation.

Grinding: Crushed ore is fed to a Φ3.2×4.5 m overflow ball mill (1,500 kW, manganese steel liners) operating in closed circuit with 6× NX300 hydrocyclones. Target grind: 80% passing 75 microns. Mill throughput: 40 t/h at 68% solids.

Gravity Concentration: Mill discharge is classified on a vibrating screen at 150 microns. Coarse fraction reports to a Falcon SB-400 centrifugal concentrator for free gold recovery. Concentrate is upgraded on a Gemini CT-1000 shaking table and smelted on-site. Gravity recovers 65-70% of coarse gold.

CIL Circuit: Fine fraction from gravity circuit reports to 6 CIL tanks (4.5 m diameter × 5.0 m height, 80 m³ each). Cyanide leaching at 250 ppm NaCN, pH 10.5. Residence time: 24 hours. Carbon loading: 15 g/L. Gold recovery: 92-94% total (gravity + CIL).

Key Equipment

设备Specification产能
PE-750×1060 Jaw CrusherPrimary, 130-250 t/h130-250 t/h
HPT-300 Cone CrusherSecondary, hydraulic80-180 t/h
2YK-1860 Vibrating ScreenDouble-deck, 1800×6000150-300 t/h
Φ3.2×4.5 m Ball Mill1,500 kW, Mn steel liners40 t/h
6× NX300 HydrocyclonesClassification cluster40 t/h total
Falcon SB-400 ConcentratorCentrifugal, 100 t/hFree gold recovery
Gemini CT-1000 TableShaking tableConcentrate upgrading
6× CIL Tanks4.5 m dia × 5.0 m, 80 m³24 h residence

项目亮点

  • 产能: 800 TPD (240,000 TPA) gold ore
  • Total Recovery: 92-94% (gravity + CIL)
  • Gravity Recovery: 65-70% of free gold
  • Power: 3.5 MW (diesel generator backup)
  • Water: 80% recycling, 2.5 m³/t ore
  • Remote Operation: Self-sufficient camp facility
  • Timeline: 14 months EPC delivery
  • Location: Kraton, Matabeleland, Zimbabwe

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0333
  • 位置 克兰顿, 纳米比亚
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 800 tpd
  • 交付时间 14 个月
  • 设备数量 22 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com