尼日利亚卡杜纳州金炭浆浸出(CIL)炭浆浸出厂。WSHT 为难处理金矿石加工设计了 1,000 吨/天的破碎、磨矿和 8 阶段 CIL 流程。

Kaduna State, Nigeria
2024
项目案例研究
1,000 吨/日产能
25 设备单位
18 月度交付

Project Overview

The Nigeria Kaduna State Gold CIL Carbon-in-Leach Plant processes refractory gold ore from the Nigerian Shield greenstone belt. WSHT Mining Group delivered a complete CIL facility including three-stage crushing, SAG/ball milling, and 8-stage carbon-in-leach circuit designed for high gold recovery from sulfide-bearing ore.

Ore Characteristics

The ore is a banded iron formation (BIF) hosted gold deposit with gold finely disseminated in pyrite and arsenopyrite. Average grade: 3.8 g/t Au. The ore is refractory (72% recovery by direct cyanidation) requiring fine grind and extended leach time for acceptable recovery. Bond Work Index: 15.8 kWh/t.

Process Flow

Crushing: Three-stage crushing circuit: C120 jaw crusher (primary) → HP500 cone crusher (secondary) → HP300 cone crusher (tertiary). Product: P80 = 8 mm at 60 t/h. Total installed crushing capacity: 180 t/h.

Grinding: A Φ4.0×6.0 m SAG mill (2,200 kW) operates in closed circuit with a vibrating screen, reducing ore to P80 = 2 mm. A Φ3.2×4.5 m ball mill (1,500 kW) grinds to 80% passing 53 microns (finer grind for refractory ore). Combined grinding power: 3,700 kW.

CIL Circuit: Ground slurry is thickened to 50% solids and pumped through 8 CIL tanks (5.0 m diameter × 5.5 m height, 108 m³ each). Extended leach time: 48 hours (vs 24 hours for non-refractory). Cyanide concentration: 350 ppm NaCN. Lime consumption: 4.0 kg/t (higher due to acid-generating sulfides).

Gold Recovery: Loaded carbon is stripped in a split ADR elution circuit. Gold recovery: 92-94% (improved from 72% direct cyanidation). Doré bars produced: 98.2% Au purity.

Key Equipment

设备Specification产能
C120 Jaw Crusher1200×900 mm feed opening180-350 t/h
HP500 Cone CrusherSecondary, medium cavity100-200 t/h
HP300 Cone CrusherTertiary, fine cavity60-120 t/h
Φ4.0×6.0 m SAG Mill2,200 kW, gearless60 t/h
Φ3.2×4.5 m Ball Mill1,500 kW, rubber liners45 t/h
8× CIL Tanks5.0 m dia × 5.5 m, 108 m³48 h residence
Split ADR Elution3-stage, 120°C15 t carbon
EW Cell Bank36 cathodes, stainless80 kg Au/day

项目亮点

  • 产能: 1,000 TPD (300,000 TPA) refractory ore
  • Gold Recovery: 92-94% CIL (vs 72% direct CN)
  • Product: Doré bars 98.2% Au purity
  • Power: 5.5 MW (dual-fuel generators)
  • Water: 75% recycling, 2.8 m³/t ore
  • Camp: 200-person accommodation facility
  • Timeline: 18 months EPC delivery
  • Location: Kaduna State, Nigeria

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0334
  • 位置 Kaduna State, Nigeria
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 1,000 tpd
  • 交付时间 18个月
  • 设备数量 25 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com