WSHT Mining Group
WSHT Mining Group
EPC Case Study · 项目案例研究

柬埔寨 Mondulkiri 矿堆浸及尾矿项目

柬埔寨 Mondulkiri 省金堆浸及尾矿管理项目。WSHT 设计了一座处理量为 500 吨/天的氧化矿堆浸设施,采用 ADR 金回收工艺,并进行了尾矿储存工程。

柬埔寨 Mondulkiri
2025
项目案例研究
500 吨/日产能
15 设备单位
12 月度交付

Project Overview

The Cambodia Mondulkiri Mine Heap Leaching & Tailing Project processes gold oxide ore (1.8 g/t Au) from the Cardamom Mountains through conventional heap leach technology. WSHT Mining Group designed the complete facility including heap leach pad, solution management, ADR gold recovery, and engineered tailings storage facility (TSF).

Ore Characteristics

The oxide ore is weathered laterite capping overlying primary sulfide mineralization. Gold occurs as fine free particles (60%) and colloidal gold adsorbed on iron oxides (40%). The ore is soft (Bond Work Index 8.5 kWh/t) and amenable to run-of-mine or crush-only heap leaching with 80% passing 25 mm.

Process Flow

Crushing: ROM ore is scalped at 500 mm and fed to a C100 jaw crusher via a vibrating grizzly. Product (−100 mm) is conveyored to the heap leach pad. Two-stage crushing (jaw + cone) produces −25 mm material for improved leach kinetics. Total crushing capacity: 80 t/h.

Heap Leach Pad: A 120 m × 80 m heap leach pad is constructed with double-lined HDPE geomembrane (1.5 mm + 1.0 mm) over compacted clay. Crushed ore is stacked in 8 m lifts by a CAT 980F wheel loader. Cyanide solution (0.05% NaCN, pH 10.5) is irrigulated at 10 L/m²/h through drip emitters. Leach cycle: 90 days per lift.

Gold Recovery: Pregnant leach solution (PLS, 2-4 g/m³ Au) is pumped to a three-stage carbon adsorption circuit (3× Φ2.5×5 m columns, 40 m³ each). Loaded carbon is stripped in a 3-stage ADR elution circuit, electrowon, and smelted to doré bars.

Tailings: Spent ore is rehandled to an engineered TSF with 100,000 m³ design capacity. The TSF features HDPE liner, decant tower, and return water collection system.

Key Equipment

设备Specification产能
C100 Jaw Crusher1000×650 mm feed opening80-150 t/h
HP200 Cone CrusherSecondary crushing50-100 t/h
Heap Leach Pad120 m × 80 m, double-lined500 TPD
3× Carbon ColumnsΦ2.5×5 m, 40 m³ eachPLS adsorption
ADR Elution Circuit3-stage, Zadra process10 t carbon
Electrowinning Cell12 cathodes, stainless25 kg Au/day
TSF100,000 m³, HDPE linedTailings storage
Drip Irrigation SystemPressure-compensating10 L/m²/h

项目亮点

  • 产能: 500 TPD heap leach (150,000 TPA)
  • Gold Recovery: 75-80% from oxide ore
  • Pad Area: 9,600 m² (expandable to 25,000 m²)
  • Heap Height: 8 m per lift, 3 lifts planned
  • Cyanide Consumption: 0.3 kg/t ore
  • Water Balance: 60% evaporation loss makeup
  • Timeline: 12 months EPC delivery
  • Location: Mondulkiri Province, Cambodia

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0331
  • 位置 柬埔寨 Mondulkiri
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 500 tpd
  • 交付时间 12 个月
  • 设备数量 15台
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com