EPC Case Study · 项目案例研究

越南胡志明市水冶与尾矿库项目

越南胡志明市附近水冶铜处理工厂及工程化尾矿库。采用酸浸提纯-电解工艺,生产LME Grade A铜阴极。

胡志明市,越南
2025
项目案例研究
500 吨/日产能
18 设备单位
16 月度交付

Project Overview

The Vietnam Ho Chi Minh City Hydrometallurgy & Tailing Pond Project is an integrated copper oxide processing facility located in Binh Duong Province, 30 km north of Ho Chi Minh City. WSHT Mining Group delivered the complete hydrometallurgical plant and engineered tailings storage facility for producing 15,000 TPA LME Grade A copper cathode.

Ore Characteristics

The ore is a copper oxide cap (malachite, azurite, chrysocolla) overlying secondary copper sulfides (chalcocite, covellite). Average grade: 1.5% Cu oxide, 0.8% Cu sulfide. The oxide fraction is amenable to acid leaching with 85% extraction efficiency.

Process Flow

Crushing & Agglomeration: ROM ore (−300 mm) is crushed in two stages to −25 mm, then agglomerated with cement (15 kg/t) and sulfuric acid in a rotary drum. Agglomerated ore is heap-stacked on a 150 m × 100 m lined heap pad.

Acid Leach: Sulfuric acid solution (30-50 g/L H₂SO₄) is irrigulated at 12 L/m²/h. Leach cycle: 120 days. PLS copper concentration reaches 5-8 g/L Cu. Iron contamination is controlled by pH adjustment and jarosite precipitation.

Solvent Extraction: PLS is clarified in a 500 m³ settling tank, then processed through a 3-stage mixer-settler circuit (2× 50 m³ mixers per stage, 400 m² settlers). Organic phase: LIX 984N (25% vol) in ShellSol D230. Strip solution: 50 g/L Cu, 180 g/L H₂SO₄.

Electrowinning: Pregnant strip solution is electrolyzed in 4 cells × 120 cathodes each (480 cathodes total). Current density: 320 A/m². Cathode deposition time: 10 days. Cathodes are stripped, washed, and palletized for LME delivery.

Key Equipment

设备Specification产能
PE-900×1200 Jaw CrusherPrimary crushing220-450 t/h
HP300 Cone CrusherSecondary crushing80-180 t/h
Rotary AgglomeratorΦ2.2×8 m, 60 t/hOre agglomeration
Heap Leach Pad150 m × 100 m, HDPE lined500 TPD
3-Stage Mixer-Settlers2× 50 m³ mixers, 400 m²Cu extraction
4× EW Cell Banks120 cathodes each, 480 totalCathode production
Acid Dosing SystemH₂SO₄, 3,000 L/hLeach solution
TSF200,000 m³, HDPE linedTailings storage

项目亮点

  • 产能: 500 TPD ore processing (150,000 TPA)
  • Copper Production: 15,000 TPA LME Grade A cathode
  • Heap Area: 15,000 m² (expandable to 40,000 m²)
  • Acid Consumption: 85 kg/t ore
  • Current Efficiency: 98.5% cathode purity
  • Power: 4.5 MW connected (3.2 MW average)
  • Timeline: 16 months EPC delivery
  • Location: Binh Duong Province, Vietnam

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0332
  • 位置 胡志明市,越南
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 500 tpd
  • 交付时间 16个月
  • 设备数量 18 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com