Project Overview

The Kyrgyzstan Talas Oblast Flotation Concentrator is a greenfield EPC project processing polymetallic sulfide ore containing copper (1.2% Cu), zinc (2.8% Zn), and gold (0.8 g/t Au). WSHT Mining Group delivered the complete mineral processing facility from ROM ore reception through to final concentrate filtration and dispatch.

Ore Characteristics

The deposit is a volcanogenic massive sulfide (VMS) type with chalcopyrite, sphalerite, and pyrite as the principal ore minerals. The ore has a Bond Work Index of 14.5 kWh/t (medium-hard) and requires fine grinding to 80% passing 45 microns for optimal mineral liberation. The sequential flotation circuit separates copper, zinc, and pyrite concentrates in a differential flotation arrangement.

Process Flow

Crushing: ROM ore (P80 = 800 mm) is reduced to P80 = 10 mm through a three-stage crushing circuit comprising a C140 jaw crusher (primary), two HP500 cone crushers (secondary and tertiary), and a 3YK-2460 vibrating screen for closed-circuit classification. Total crushing capacity: 250 t/h.

Grinding: The crushing product is stored in a 5,000-tonne live stockpile, then metered to a Φ4.0×6.0 m overflow ball mill (2,200 kW) operating in closed circuit with a cluster of 8× NX350 hydrocyclones. Target grind: 80% passing 45 microns. The mill processes 120 t/h at 65% solids density.

Flotation: Ground slurry is conditioned with sodium isopropyl xanthate (collector) and methyl isobutyl carbinol (MIBC frother) before entering the sequential flotation circuit. The rougher circuit consists of 8× OK-160 forced-air flotation cells (160 m³ each) providing 30 minutes residence time. Copper is selectively floated first, followed by zinc activation with copper sulfate and subsequent zinc flotation. Pyrite is recovered in the scavenger circuit.

Concentrate Handling: Copper concentrate (28% Cu) and zinc concentrate (55% Zn) are separately thickened in 15 m diameter high-rate thickeners, then dewatered on 60 m² pressure filters to 9% moisture. Concentrates are stored in separate covered bins before dispatch by truck.

Key Equipment

设备Specification产能
C140 Jaw Crusher1400×1060 mm feed opening250-400 t/h
2× HP500 Cone CrushersMedium and fine crushing150-300 t/h each
3YK-2460 Vibrating Screen3-deck, 2400×6000 mm200-400 t/h
Φ4.0×6.0 m Ball Mill2,200 kW, rubber liners120 t/h
8× NX350 HydrocyclonesClassification cluster120 t/h total
8× OK-160 Flotation CellsForced-air, 160 m³ each1,280 m³ rougher
2× 15m ThickenersHigh-rate, paste discharge80 t/h each
2× 60m² Pressure FiltersMembrane type40 t/h each

项目亮点

  • 产能: 2,000 TPD (600,000 TPA) polymetallic ore
  • Copper Concentrate: 28% Cu grade, 92% recovery
  • Zinc Concentrate: 55% Zn grade, 87% recovery
  • Gold Recovery: 78% into copper concentrate
  • Water Recycling: 85% process water recycled
  • Power: 8 MW connected load, 5.5 MW average
  • Timeline: 18 months EPC delivery
  • Location: 塔拉斯州,吉尔吉斯斯坦

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0329
  • 位置 塔拉斯州,吉尔吉斯斯坦
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 2,000 tpd
  • 交付时间 18个月
  • 设备数量 28 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com