EPC Case Study · 项目案例研究

南非共和国 约翰内斯堡 破碎与矿物加工综合体

集成了破碎、研磨和CIL金处理的综合体,位于南非约翰内斯堡。该设施通过三段破碎、SAG/球磨机和八段碳浸出工艺,处理3000吨/天的含金矿石。

南非约翰内斯堡
2024
项目案例研究
3,000 吨/日产能
35 设备单位
24 月度交付

Project Overview

The Johannesburg Crushing & Mineral Processing Complex is a brownfield expansion project converting a former gold mine into a modern CIL processing facility. WSHT Mining Group designed and supplied the complete comminution and leach circuit for processing 3,000 TPD of underground gold ore from the Witwatersrand Basin.

Ore Characteristics

The Witwatersrand gold ore is quartzite-hosted with fine-grained gold particles (average 4.5 g/t Au) disseminated through pyritic reef units. The ore is competent (UCS 180-220 MPa) and requires aggressive grinding to liberate the fine gold from the siliceous gangue. Bond Ball Mill Work Index: 16.2 kWh/t.

Process Flow

Crushing: Underground ore is tip-loaded to a 200-tonne receiving bin. A vibrating grizzly feeder scalps fines to bypass the C160 jaw crusher (primary, 400-800 t/h). Secondary and tertiary crushing is performed by two HP800 Symons cone crushers in series, producing a P80 = 10 mm product at 150 t/h.

Grinding: A Φ6.2×2.5 m SAG mill (4,500 kW, gearless drive) operates in closed circuit with a vibrating screen, reducing product to P80 = 2 mm. Two Φ4.0×6.0 m ball mills (each 2,200 kW) grind to 80% passing 75 microns in closed circuit with hydrocyclone clusters. Combined grinding power: 8,900 kW.

CIL Circuit: Ground slurry is thickened to 50% solids and pumped through 8 CIL tanks (6.0 m diameter × 6.5 m height, 185 m³ each). Cyanide concentration is maintained at 200-300 ppm NaCN at pH 10.5 (lime dosing). Total leach residence time: 36 hours. Activated carbon (24×48 mesh coconut shell) is loaded at 15 g/L and advanced counter-current to the slurry flow.

Gold Recovery: Loaded carbon is stripped in a Zadra elution circuit at 110°C and 1% NaCN/NaOH solution. Gold is recovered by electrowinning on stainless steel cathodes and smelted to doré bars (98.5% Au, 1.2% Ag). Strip efficiency: 99.5% in 6 stages.

Key Equipment

设备Specification产能
C160 Jaw Crusher1600×1200 mm feed opening400-800 t/h
2× HP800 Cone CrushersSecondary + tertiary200-400 t/h each
Φ6.2×2.5 m SAG Mill4,500 kW, gearless drive150 t/h
2× Φ4.0×6.0 m Ball Mills2,200 kW each120 t/h each
8× CIL Tanks6.0 m dia × 6.5 m, 185 m³36 h residence
Zadra Elution Circuit3-stage, 110°C20 t carbon
Electrowinning Cell Bank48 cathodes, stainless steel150 kg Au/day
Induction Furnace500 kg capacityDoré production

项目亮点

  • 产能: 3,000 TPD (900,000 TPA) gold ore
  • Gold Recovery: 94-96% CIL recovery
  • Concentrate: Doré bars 98.5% Au purity
  • Power: 12 MW installed, 8.5 MW average
  • Water: 70% recycling, 1.8 m³/t ore
  • Staffing: 120 operational personnel
  • Timeline: 24 months EPC delivery
  • Location: Johannesburg, Gauteng, South Africa

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0330
  • 位置 南非约翰内斯堡
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 3,000 tpd
  • 交付时间 24个月
  • 设备数量 35台
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com