卫辉万友建材项目,河南省,中国

标准化1,000 TPH绿色建材工厂,位于河南省卫辉市。零排放运行,全面符合环保要求,并获得河南省绿色矿山认证。

Weihui, Henan, China
2025
项目案例研究
1,000 吨/日产能
16 设备单位
8 月度交付

Project Overview

The Weihui Wanyou Building Materials Project in Henan Province is a model for standardized green building material production. This 1,000 TPH plant achieves zero-discharge operation and has received Henan Province Green Mine certification.

项目范围

WSHT supplied a complete three-stage crushing and screening system designed to meet China strictest environmental standards. The facility processes local limestone with comprehensive dust control, noise reduction, and water recycling systems.

Process Flow

Primary Crushing: A C120 jaw crusher (1200×900 mm, 180-350 t/h) in a fully enclosed crushing chamber with negative-pressure dust extraction system.

Secondary Crushing: 2× HPT-300 multi-cylinder cone crushers (100-200 t/h each) in parallel for −40 mm product. Sound-insulated crusher housings reduce noise to < 75 dB at 1m distance.

Tertiary Crushing: VSI-8518 sand maker (80-180 t/h) for manufactured sand and fine aggregate. Product washed in XSD-2610 sand washer.

Environmental Systems: Complete dust collection (pulse-jet bag filter, 99.5% efficiency), noise barriers (3m height, 25 dB reduction), and zero-discharge water treatment (multi-stage settling + filtration).

Key Equipment

设备Specification产能
C120 Jaw Crusher1200×900 mm, 180-350 t/hPrimary (enclosed)
2× HPT-300 Cone CrushersMulti-cylinder, 100-200 t/hSecondary
VSI-8518 Sand Maker80-180 t/hTertiary + sand
XSD-2610 Sand WasherWheel type, 100 t/hSand washing
Pulse-Jet Bag Filter2,000 m², 99.5% efficiencyDust collection
Noise Barriers3m height, steel + absorberNoise control
Water TreatmentSettling + filtration, zero-dischargeWater management
SCADA ControlAutomated, remote monitoringIntelligence

项目亮点

  • 产能: 1,000 TPH (300,000 TPA)
  • Environmental: Zero-discharge, 99.5% dust capture
  • Noise: Below 75 dB at property boundary
  • Water: 100% recycling, closed-loop system
  • Certification: Henan Province Green Mine certified
  • Power: 5 MW connected, 3.5 MW average
  • Timeline: 8 months EPC delivery
  • Location: Weihui City, Henan, China

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0344
  • 位置 Weihui, Henan, China
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 1,000 tpd
  • 交付时间 8个月
  • 设备数量 16 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com