Project Overview

The Sichuan-Tibet Railway China Railway 11th Bureau High-Quality Aggregate Project is a critical infrastructure support facility for one of the world most challenging railway construction projects. This 1,000 TPH plant operates at altitudes of 3,000-4,500 meters in extreme mountain terrain.

项目范围

WSHT designed a mobile and modular crushing solution capable of rapid deployment along the railway alignment. The system processes local granite and gneiss into railway-grade aggregates meeting TB/T 2140 standards.

Process Flow

Primary Crushing: A track-mounted jaw crusher (C100, 1000×650 mm) processes blasted rock at 150-300 t/h. Mobile design allows relocation every 3-6 months as construction progresses.

Secondary Crushing: A modular cone crusher (HP300, 100-200 t/h) on a portable skid reduces product to −40 mm. Altitude-compensated engine maintains power output at 4,000m elevation.

Screening: A triple-deck vibrating screen (3YK-1860, 100-200 t/h) classifies product into railway ballast (25-60 mm), concrete aggregate (5-25 mm), and manufactured sand (0-5 mm).

Key Equipment

设备Specification产能
Track-Mounted C100 Jaw1000×650 mm, 150-300 t/hPrimary (mobile)
Portable HP300 Cone100-200 t/h, altitude-ratedSecondary (modular)
3YK-1860 ScreenTriple-deck, 100-200 t/hClassification
Altitude CompensationTurbocharger, engine derating4,000m+ operation
Dust SuppressionEnclosed chambers + waterEnvironmental
Diesel Generators2× 1.5 MW, Tier 4 FinalPower supply
Mobile ChassisTrack-mounted + towedRelocation
PLC ControlAutomated, remote monitoringIntelligence

项目亮点

  • 产能: 1,000 TPH (300,000 TPA)
  • Special: High-altitude operation (3,000-4,500m)
  • Quality: TB/T 2140 railway ballast standards
  • Mobile: Track-mounted primary, rapid relocation
  • Power: Dual 1.5 MW diesel generators
  • Challenge: Extreme terrain, seismic zone
  • Timeline: 8 months deployment
  • Location: Sichuan-Tibet Railway, China

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0343
  • 位置 中国川藏
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 2,000 tpd
  • 交付时间 6个月
  • 设备数量 30 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com