EPC Case Study · 项目案例研究

尼日利亚卡瓦州尾矿储存支持处理厂

尼日利亚卡瓦州尾矿储存及支持处理厂。从历史矿尾中回收残余金和基础金属,采用工程化尾矿储存设施(TSF)。

尼日利亚 Kwara 州
2024
项目案例研究
500 吨/日产能
12 设备单位
16 月度交付

Project Overview

The Nigeria Kwara State Tailing Storage Supporting Processing Plant is a dual-purpose facility combining historical tailings reclamation with engineered tailings storage. WSHT Mining Group designed a processing plant to recover residual gold (1.2 g/t) and base metals from legacy mine dumps, while constructing a modern lined tailings storage facility (TSF) for current operations.

Material Characteristics

The historical tailings are sand-textured (80% passing 150 microns) with residual gold (1.2 g/t), lead (0.8% Pb), and zinc (0.5% Zn). The material is free-digging and requires minimal processing — scrubbing, classification, gravity concentration, and flotation.

Process Flow

Material Handling: Historical tailings are excavated by excavator and trucked to the processing plant. A 500-tonne receiving hopper feeds the scrubbing circuit.

Scrubbing & Classification: A twin-shaft log washer (3.0×6.0 m) scrubs material at 100 t/h. Classifiers separate sand (+150 μm) from slimes (−150 μm). Sand fraction reports to gravity concentration. Slimes report to flotation.

Gravity Concentration: A Falcon SB-380 centrifugal concentrator processes the sand fraction at 60 t/h. Concentrate is upgraded on a shaking table and smelted to gold bars (85% Au purity). Gravity recovery: 70% of coarse gold.

Flotation: Slime fraction is conditioned with lead collector (SIPX) and frother (MIBC), then processed through 4× OK-50 flotation cells (50 m³ each) for lead-zinc sulfide recovery. Lead concentrate (55% Pb) and zinc concentrate (50% Zn) are filtered and sold.

TSF Construction: A new 200,000 m³ engineered TSF is constructed with HDPE liner (1.5 mm), decant tower, and return water system. Designed for 20-year storage life.

Key Equipment

设备Specification产能
Twin-Shaft Log Washer3.0×6.0 m, 100 t/hScrubbing
Vibrating Screens2-deck, 1800×4800 mmClassification
Falcon SB-380 ConcentratorCentrifugal, 60 t/hGold recovery
Gemini Shaking TableCT-1000, concentrate upgradeGold upgrading
4× OK-50 Flotation Cells50 m³ each, forced-airPb-Zn flotation
Filter Press30 m², membraneConcentrate dewatering
New TSF200,000 m³, HDPE linedTailings storage
Decant Tower8 m height, steelWater recovery

项目亮点

  • 产能: 500 TPD tailings processing
  • Gold Recovery: 70% gravity (0.84 g/t recovered)
  • Lead Recovery: 65% flotation (55% Pb concentrate)
  • Zinc Recovery: 60% flotation (50% Zn concentrate)
  • TSF Capacity: 200,000 m³ (20-year life)
  • Environmental: Legacy tailings containment
  • Timeline: 16 months (plant + TSF)
  • Location: 尼日利亚 Kwara 州

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0336
  • 位置 尼日利亚 Kwara 州
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 500 tpd
  • 交付时间 16个月
  • 设备数量 12 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com