Project Overview
The Lvdaeyuan Building Materials Co., Ltd. Project is one of the largest single-line aggregate production facilities in southwestern China. Located in Chongqing municipality, this 6,000 TPH plant processes limestone for the region massive infrastructure and urbanization programs.
项目范围
WSHT designed and supplied a three-stage crushing and screening plant optimized for Chongqing limestone (compressive strength 80-120 MPa, Bond Work Index 11.5 kWh/t). The plant operates 24/7 with 92% availability.
Process Flow
Primary Crushing: A C200 jaw crusher (2000×1500 mm) processes ROM limestone (P80 = 1,500 mm) at 1,000-1,500 t/h. The crusher features hydraulic toggle adjustment for CSS optimization.
Secondary Crushing: 4× HP800 cone crushers (standard cavity) operate in parallel at 300-500 t/h each, reducing product to −60 mm. Load-sharing control maintains equal throughput across all four units.
Tertiary Crushing: 2× HP500 cone crushers (short-head cavity) produce −25 mm final product at 250-400 t/h each. Closed-circuit with 2× 4YK-3072 screens.
Screening & Stockpile: 4× 4YK-3072 screens classify product into 5 sizes. Radial stackers create 50,000-tonne live stockpiles per product size.
Key Equipment
| 设备 | Specification | 产能 |
|---|---|---|
| C200 Jaw Crusher | 2000×1500 mm, 1000-1500 t/h | Primary |
| 4× HP800 Cone Crushers | Standard cavity, 300-500 t/h | Secondary |
| 2× HP500 Cone Crushers | Short-head, 250-400 t/h | Tertiary |
| 4× 4YK-3072 Screens | 4-deck, high-capacity | Classification |
| 5× Radial Stackers | 1.4 m belt, 1000 t/h | Stockpiling |
| SCADA Control System | PLC + HMI + remote | Intelligence |
| Dust Suppression | Enclosed transfer points | Environmental |
| Water Recycling | Settling ponds, 80% reuse | Water management |
项目亮点
- 产能: 6,000 TPH (1,800,000 TPA)
- Products: 5 aggregate sizes for concrete and asphalt
- Operation: 24/7, 92% availability, 350 operating days
- Automation: Fully automated, 45 operators per shift
- Power: 25 MW connected, 18 MW average
- Market: Supplies Chongqing metro and highway projects
- Timeline: 12 months EPC delivery
- Location: 中国重庆市