EPC Case Study · 项目案例研究

晋城瑞安建材项目,山西省,中国

晋城生态友好型2000吨每小时砂石生产线,全封闭,负压除尘,水回收率达98%,符合山西绿色矿山标准。

晋城,山西,中国
2025
项目案例研究
1,000 吨/日产能
16 设备单位
10 月度交付

Project Overview

The Jincheng Ruian Building Materials Project in Shanxi Province is a new-generation eco-friendly aggregate production facility. This 2,000 TPH plant combines high-efficiency crushing with comprehensive environmental protection, meeting Shanxi Province strictest green mine standards.

项目范围

WSHT provided a complete aggregate processing solution with emphasis on dust control, noise reduction, and water conservation. The facility processes local limestone and sandstone into premium construction aggregates.

Process Flow

Primary Crushing: C140 jaw crusher (1400×1060 mm, 250-500 t/h) in fully enclosed crushing chamber with negative-pressure dust extraction (−50 Pa differential).

Secondary Crushing: 2× HPT-300 multi-cylinder cone crushers (100-200 t/h each) with sound-insulated housings (noise < 75 dB at 1m).

Tertiary Sand Making: VSI-8518 sand maker (80-180 t/h) with water spray dust suppression at feed and discharge points.

Water Management: Complete water recycling system: process water → multi-stage settling → filtration → reuse. 98% recycling rate, zero liquid discharge.

Key Equipment

设备Specification产能
C140 Jaw Crusher1400×1060 mm, 250-500 t/hPrimary (enclosed)
2× HPT-300 Cone CrushersMulti-cylinder, 100-200 t/hSecondary
VSI-8518 Sand Maker80-180 t/hTertiary + sand
XSD-2610 Sand WasherWheel type, 100 t/hSand washing
Negative-Pressure System−50 Pa, dust extractionDust control
Sound InsulationCrusher housings, < 75 dBNoise control
Water RecyclingSettling + filtration, 98%Zero discharge
SCADA ControlAutomated, remote monitoringIntelligence

项目亮点

  • 产能: 2,000 TPH (600,000 TPA)
  • Environmental: Full enclosure, negative-pressure dust
  • Noise: Below 75 dB at 1m from crushers
  • Water: 98% recycling, zero liquid discharge
  • Certification: Shanxi Province Green Mine certified
  • Power: 9 MW connected, 6.5 MW average
  • Timeline: 10 months EPC delivery
  • Location: Jincheng City, Shanxi, China

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0348
  • 位置 晋城,山西,中国
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 1,000 tpd
  • 交付时间 10 个月
  • 设备数量 16 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com