EPC Case Study · 项目案例研究

大明矿业绿色建筑建材项目,广西,中国

广西加工石灰石的大型5000 TPH绿色骨料生产线。全自动化SCADA控制,5种骨料规格,集成除尘系统。

广西, 中国
2025
项目案例研究
1,500 吨/日产能
22 设备单位
14 月度交付

Project Overview

The Daming Mining Green Building Materials Project is a flagship large-scale aggregate production facility in Guangxi Province. This 5,000 TPH plant processes limestone using fully automated crushing and screening circuits with centralized SCADA control.

项目范围

WSHT delivered a high-capacity crushing and screening solution designed for continuous 24/7 operation. The plant processes medium-hard limestone (UCS 80-100 MPa) into five aggregate sizes plus manufactured sand.

Process Flow

Primary Crushing: A C180 jaw crusher (1800×1400 mm) processes ROM limestone (P80 = 1,200 mm) at 600-1,200 t/h. Hydraulic CSS adjustment optimizes crushing efficiency.

Secondary Crushing: 4× HP800 cone crushers in parallel (300-500 t/h each) reduce product to −50 mm. Automatic load-sharing ensures balanced operation.

Tertiary Crushing: 2× HP500 cone crushers produce −20 mm final product at 250-400 t/h each. Closed-circuit with 2× 4YK-3072 vibrating screens.

Product Handling: 6× radial stackers create 50,000-tonne live stockpiles. Truck loading via automated weigh-bridge system.

Key Equipment

设备Specification产能
C180 Jaw Crusher1800×1400 mm, 600-1200 t/hPrimary
4× HP800 Cone CrushersParallel, 300-500 t/h eachSecondary
2× HP500 Cone CrushersShort-head, 250-400 t/hTertiary
2× 4YK-3072 Screens4-deck, high-capacityClassification
6× Radial Stackers1.4 m belt, 1000 t/hStockpiling
SCADA SystemCentralized control, 24/7Automation
Dust CollectionBag filter, 99.5% efficiencyEnvironmental
Weigh-BridgeAutomated truck loadingLogistics

项目亮点

  • 产能: 5,000 TPH (1,500,000 TPA)
  • Products: 5 aggregate sizes + manufactured sand
  • Automation: Fully automated SCADA, 40 operators/shift
  • Operation: 24/7, 93% availability
  • Power: 22 MW connected, 16 MW average
  • Stockpile: 300,000 tonnes total live capacity
  • Timeline: 14 months EPC delivery
  • Location: Guangxi Province, China

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0340
  • 位置 广西, 中国
  • 矿物类型 项目案例研究
  • 完工年份 2025
  • 设计产能 1,500 tpd
  • 交付时间 14 个月
  • 设备数量 22 单位
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com