中国铁路11局集团:川藏铁路林芝至雅安段项目

高品质1000 TPH骨料生产线,用于川藏铁路林芝至雅安段。坚固的移动式设计,适应极端山区条件和高海拔作业。

林芝至雅安,川藏,中国
2024
项目案例研究
3,000 吨/日产能
35 设备单位
6 月度交付

Project Overview

The China Railway 11th Bureau Group Linzhi to Ya'an Section project provides high-quality aggregates for one of the most challenging railway construction segments in the world. This 1,000 TPH mobile plant processes hard rock in extreme mountain terrain at 3,500-4,500m elevation.

项目范围

WSHT designed a rugged and reliable crushing system capable of operating in extreme conditions: high altitude, seismic activity, limited road access, and severe winter weather. The modular design allows partial disassembly for transport along narrow mountain roads.

Process Flow

Primary Crushing: Track-mounted C100 jaw crusher (1000×650 mm, 150-300 t/h) processes blasted granite and gneiss. Track mobility allows relocation without crane assistance.

Secondary Crushing: Modular HP300 cone crusher (100-200 t/h) on portable skid frame. Altitude-compensated turbocharger maintains power at 4,000m+.

Screening: Triple-deck vibrating screen (3YK-1860) classifies into railway ballast (25-60 mm), concrete aggregate (5-25 mm), and manufactured sand (0-5 mm). All products meet TB/T 2140 railway standards.

Key Equipment

设备Specification产能
Track-Mounted C100 Jaw1000×650 mm, 150-300 t/hPrimary (mobile)
Modular HP300 Cone100-200 t/h, altitude-ratedSecondary
3YK-1860 ScreenTriple-deck, 100-200 t/hClassification
Altitude CompensationTurbo + ECU recalibration4,000m+ power
Enclosed ChambersDust control at altitudeEnvironmental
Diesel Generators2× 1.2 MW, cold-start ratedPower supply
Modular DesignSectional for mountain transportLogistics
PLC ControlAutomated, satellite telemetryRemote monitoring

项目亮点

  • 产能: 1,000 TPH (300,000 TPA)
  • Altitude: 3,500-4,500m operation
  • Quality: TB/T 2140 railway ballast + C50 concrete
  • Mobile: Track-mounted primary, modular secondary
  • Transport: Sectional design for narrow mountain roads
  • Power: Dual 1.2 MW diesel generators
  • Timeline: 6 months deployment
  • Location: Linzhi to Ya'an, Sichuan-Tibet Railway

项目亮点

高效交付

比计划提前30天完成,1,200多天的施工期间零安全事故。

超性能

工厂产能超过设计规格15%,在项目启动的前三个月内即可达到3,000吨/天。

环境合规

完全符合国际环保标准,包括ISO 14001认证。

客户满意度

5 年运维合同续签 —— 对我们交付质量和支持的有力证明。

是否有类似项目在考虑中?

我们的EPC团队已在全球交付了500多个采矿项目。请告诉我们您的项目情况——我们将在48小时内回复。

项目信息

  • 项目编号 WSHT-EPC-0347
  • 位置 林芝至雅安,川藏,中国
  • 矿物类型 项目案例研究
  • 完工年份 2024
  • 设计产能 3,000 tpd
  • 交付时间 6个月
  • 设备数量 35台
  • 项目范围 全EPC + O&M⟦SEP⟧

EPC 项目热线

+86 135 2500 5907

今日与我们的资深EPC工程师交谈。免费咨询及现场评估。

启动您的EPC项目

从概念到投产 — 一个伙伴,一个承诺。

告诉我们您的矿体情况、目标产能和项目地点。我们的EPC团队将在48小时内提供定制提案。

EPC 热线 +86 135 2500 5907
项目邮箱 info@wshtmining.com