WSHT Mining Group
WSHT Mining Group
首页⟦SEP⟧ 工艺设计 & 解决方案 非铁金属加工(铜) 铜堆浸出与SX-EW——水法冶金铜生产

铜堆浸出与SX-EW——水法冶金铜生产

SX-EW for Copper Oxide Ores

Heap leaching followed by SX-EW is the standard route for copper oxide ores (malachite, azurite) and secondary sulphides (chalcocite).

Heap Leach Design

Engineered pads with double HDPE liners, lift heights 6-10 m, leach cycles 60-120 days. PLS with 2-8 g/L Cu routed to SX.

Solvent Extraction

Mixer-settler SX circuits extract copper into organic phase. Strip solution produces 30-50 g/L Cu electrolyte for electrowinning.

Electrowinning

Electrolytic cells deposit 99.99% pure copper cathode. WSHT supplies complete EW plant design.

关键亮点

定制流程设计
实验室验证性能
全EPC交钥匙交付⟦SEP⟧
持续优化支持

准备好讨论您的项目了吗?

联系我们的工艺工程团队,获取定制化解决方案。

获取报价