Project Overview

WSHT completed a turnkey EPC (Engineering, Procurement and Construction) project for a 500 tonnes-per-day copper sulfide processing plant in the Democratic Republic of Congo. The project was delivered on schedule and within budget, achieving all performance guarantees.

Project Background

The client is a mid-tier mining company operating a copper sulfide deposit in the Katanga Copperbelt region. The project required a complete processing plant — from primary crushing to final concentrate — capable of producing 22-25% copper concentrate for smelting.

工艺设计⟦SEP⟧

Crushing Circuit:

  • Primary jaw crusher (600×900mm) — feed size up to 500mm
  • Secondary cone crusher in closed circuit with vibrating screen
  • Product size: 80% passing 12mm

Grinding Circuit:

  • Ball mill (2.4m × 4.5m) in closed circuit with hydrocyclones
  • Grinding product: 80% passing 150 microns

Flotation Circuit:

  • Rougher flotation, scavenger flotation and two-stage cleaner flotation
  • Flotation cell volumes: 20m³ rougher, 10m³ cleaner
  • Reagent scheme: xanthate collector, MIBC frother, lime pH modifier
WSHT Copper Processing Plant DRC

500 TPD Copper Processing Plant — DRC, Africa

Equipment Supplied

WSHT provided the complete equipment scope including:

  • Jaw crusher, cone crusher, vibrating screens
  • Belt conveyors, feeders and chutework
  • Ball mill, hydrocyclone cluster
  • Flotation cells (rougher, scavenger, cleaner banks)
  • Reagent preparation and dosing system
  • Thickener, filter press and concentrate handling
  • Complete MCC, PLC and control system

Project Execution Results

  • Throughput: 520 tpd (design 500 tpd)
  • Concentrate grade: 24.5% Cu (design 22%)
  • Copper recovery: 89% (design 86%)
  • Project duration: 14 months from contract to first concentrate
  • Equipment availability: 93% after commissioning

Customer Testimonial

The DRC-based customer praised WSHT's project management, equipment quality and after-sales support. The plant has been operating reliably for over 18 months with consistently excellent metallurgical performance.

WSHT provides complete EPC solutions for copper processing plants from 100 to 5,000+ tpd. Contact us to discuss your copper project requirements.