移动破碎站用于公路建设 — 菲律宾

一项租赁合同,用于为菲律宾一项主要公路建设项目提供骨料的移动破碎和筛分站。该设备在18个月的合同期间共生产了200,000吨各种骨料产品。

coco
编辑团队
2026-06-24 2分钟阅读
移动破碎站用于公路建设 — 菲律宾

Project Overview

WSHT Mining Group supplied a complete mobile crushing and screening plant on a rental contract for a major infrastructure project in the Philippines. The plant was deployed to produce approximately 200,000 tonnes of aggregate products for a 45-kilometer highway upgrade project connecting Manila to the Clark economic zone.

Project Requirements

The client required a reliable, high-capacity crushing solution that could:

  • Produce multiple aggregate fractions simultaneously
  • Move between three quarry sites along the project corridor
  • Achieve consistent product quality meeting Philippine National Standards
  • Operate efficiently in tropical climate conditions

Equipment Supplied

Mobile Primary Crushing Unit:

  • Tracked jaw crusher 900×600 mm
  • Hydraulic feed hopper with variable speed feeder
  • Pre-screen to bypass fines
  • Side conveyor for oversize material

Mobile Secondary Crushing/Screening Unit:

  • Tracked cone crusher 1350mm feed opening
  • Triple-deck screen for four products
  • Product conveyors with radial stacking
  • Centralized control system

Supporting Equipment:

  • Diesel generator sets for power supply
  • Wheel loader for feed loading
  • Spare parts package and technical support
Mobile Crushing Plant Philippines

Mobile Crushing Plant — Highway Construction Project

Operating Conditions

The project operated in challenging tropical conditions:

  • Temperature: 28-35°C ambient
  • Humidity: 80-95% relative humidity
  • Material: Basalt and andesite with low silica content
  • Feed Material: blasted rock from local quarries, -600mm feed size

Production Results

  • Total Production: 215,000 tonnes over 18 months
  • Product Mix: 0-5mm, 5-10mm, 10-20mm, 20-40mm
  • Average Throughput: 150 tph (design 180 tph)
  • Equipment Availability: 91%
  • Product Quality: 100% passing Philippine National Standards specifications

Project Benefits

Flexibility: The mobile plant was relocated twice during the project as quarry sites were exhausted, with each relocation completed within two weeks.

Cost Efficiency: Rental model allowed the client to match equipment costs to project phases, avoiding capital investment for equipment used only during the project duration.

Local Support: WSHT maintained a technician on-site throughout the project to ensure maximum availability and provide operator training.

The project was completed on schedule, and the client subsequently purchased the mobile plant for use on future infrastructure projects in the region.